6KW ground mount, single posts, in La Luz Canyon.
This 33kw system was installed in 2014 in Alamogordo. The owners for this residence were paying, on average, $800 per month with peak months running around $1100 per month.
This 21kw system was designed and installed by Zuni Electric to balance out a heavy monthly electric bill in Alamogordo. This system was installed early 2016 in time for the peak energy usage season.
This large ground mount array is a 78kw commercial system that was performed for the Otero County Electric Company, located off the Highway 54 Bypass.